Sod Prep & Installation
Ground Prep
Proper ground prep ensures your sod will roll out level and be able to properly establish a healthy root system.
- Install sprinkler system
- Clear all rocks and weeds.
- Til ground to approx 4″ or add 4″ of topsoil mulch.
- Rake out and level soil.
- Use roller to smooth and compact the soil.
Ordering, Installing & Watering Your Sod
Cedar Ridge Sod is the #1 sod grower in the White Mountains.
- Find the square footage you need by multiplying the areas length times its width.
- Order your sod by calling or email Cedar Ridge Sod (928-521-8873).
- Sod is available for both delivery and pick-up.
Proper sod installation will ensure proper establishment of your newly rolled sod.
- Install sod within 24hrs of arrival.
- Start with a long straight line.
- Offset end seems (brick wall pattern).
- Pull rolls tightly together.
- Water immediately after installation.
The 3 most important things you can give your new lawn is … Water, Water and Water.
- Soak the sod completely immediately after installation.
- Water 3 times EVERYDAY (morning, noon & night) for 3 weeks.
- If your sod begins to brown … water it more!